Commercial Fit-Out
Commercial work is the same craft against a lease. Permits, inspections, and a landlord schedule all sit on top of the build, so the programme has to be real from day one. We build the finish level you would put in a house and hand it over ready for equipment.

What it covers
- Landlord and permit coordination
- Full interior build-out from bare shell
- Service counters, bars, and back-of-house
- Accessible washrooms to code
- Feature lighting and specialty finishes
- Snagging and handover for opening day
How we run it
Walkthrough
We come to the site, measure, and talk through what you want the finished room to do. You get a scope written in plain terms and a price against it, not a range.
Drawings & selections
Millwork gets shop drawings. Slab gets selected at the yard, with the vein laid out against the cuts. Tile, metal, and finishes are agreed before anything is ordered.
Build
One crew, one schedule, one person you call. Rough-in is set out to the finished dimensions so the details we drew are still possible at the end.
Finish & handover
Plaster, paint, and hardware go on last. We walk the job with you, list what is left, and close the list before we leave.
Commercial Fit-Out we have built
5 photographs
Other services
Start a project
Tell us what the finished room should look like.
Send through the space, the scope, and roughly when you want it done. We will come and measure, and you will get a written scope and a price against it.
